Steamboats.org Homepage  
  not logged in.
           forgot password?

STL 250 article + cobblestones returning

 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #6 (permalink)  
Old 04-24-2014, 02:43 PM
 
Join Date: Jul 2006
Posts: 226
Default New article on cobblestone project

Apparently the media is finally discovering Laclede's Landing. Here's a new article on the cobblestone repair: After delays, Laclede's Landing getting smoother ride with reset cobblestones : News The article somewhat touches on the confusion that downtown construction has caused. But, what is rather surprising is the very limited scope of the project. Apparently, it is just 2 blocks of the overall district for now. I hope that the $1.46 million isn't just to do those 2 blocks, but rather the entire project.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are Off
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
JBS Sold / Returning to service Eric Steffes River Talk & Cruises 15 08-19-2013 10:46 AM
DQ Returning to Cincinnati? Frank X. Prudent Save the DELTA QUEEN 10 05-31-2013 02:57 AM
WWJ article Jon Tschiggfrie River Talk & Cruises 0 03-16-2011 05:32 PM
DQ News Article Pat Carr Save the DELTA QUEEN 1 10-08-2007 10:07 AM
Article about the JBS Carmen Steamboats & History 0 06-29-2007 02:42 AM


All times are GMT -5. The time now is 05:48 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0 PL2
All content on this site is copyright protected and may not be re-used without written permission.
Bookmark and Share