I just came across the S&D Reflector March, 1986 Vol. 23, No. 1 issue. It contains an extensive article of the restoration of the King. Page 5 tells us that part of the resto included the repair of 56 hull cutouts (window openings cut into the hull, not original.) This work was done at Pacific Dry Dock, Oakland, Calif. June and July of 84'.