View Single Post
  #3 (permalink)  
Old 05-02-2009, 02:14 PM
Bill Wiemuth Bill Wiemuth is offline
 
Join Date: Sep 2008
Posts: 10
Default Delta Queen and city utilities

Another floating restaurant was previously at this same dock here at Coolidge Park, so connections to water, sewer, electric, natural gas, (and even cable internet!) are readily available. So far, everything is operational except the natural gas, and they are to hook that up this week.

All of these connect through flexible cables or hoses that can adjust with the slight level changes in the pool of the Tennessee River behind Nickajack Dam.

Also, they are all designed to be quickly removable in the event the Delta Queen is able to return to overnight cruising.

I've also posted photos on my blog at Delta Queen 2008 Season Blog
Reply With Quote